Focus Area: Environmental Rehabilitation

The River Nairn at Aberarder
cbec was contracted by Aberarder Estate to develop detailed designs for the restoration of the upper River Nairn, having previously conducted geomorphic and ecological assessments of the site to determine._.

Hallingdalselva Habitat Enhancement
In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway. The study reach is impacted._.

River Naver Catchment Restoration
cbec led a team to develop a prioritised catchment restoration plan on the River Naver, Sutherland. The primary objective of the project was, through reinstatement of natural geomorphic processes, to._.

Wooler Bank Stabilisation
cbec was contracted by the Tweed Forum to design measures to stabilise a section of eroding bank on the Wooler Water, Northumberland. The Wooler Water is a highly dynamic gravel-bed._.

River Wandle Restoration
cbec was contracted by The Wandle Trust in south London to restore a 1.5 km of an urban chalkstream, involving the removal/ modification of three weir structures and associated channel._.

SEPA Pilot Catchment Project – Options Appraisal and Outline Design – River Nith (Castlemains, New Cumnock)
cbec have developed detailed restoration designs for a reach of the River Nith at Castlemains, New Cumnock. This reach was prioritised for restoration in the first phase of SEPA’s pilot._.

River Otter, Devon
cbec, in conjunction with APEM Ltd, conducted habitat modelling on three ~500m long sections on the River Otter, Devon to assess the impacts of changes to the flow regime. The._.

River Nar at Pentney
cbec, in conjunction with frog environmental, were contracted by the Norfolk Rivers Trust to design restoration measures for the tidally-influenced end of a chalk stream in north Norfolk. cbec undertook._.

Ellie Burn Wetland Enhancement
cbec was contracted to develop restoration measures for the wetland around Ellie Burn, Aberdeenshire, with the ultimate aim of assisting in the improvement of the current ‘moderate’ ecological status (as._.

East Tullos Burn Restoration
cbec was contracted by Aberdeen City Council to restore the East Tullos Burn in Torry from a hard‐engineered straightened channel into a more natural stream and associated functional floodplain. An._.

River Derwent Feasibility Study
cbec was contracted by Natural England to investigate opportunities available for restoration of the upper River Derwent and Stonethwaite Beck in Borrowdale, Cumbria. A desk-based literature review was followed._.

Allt Lorgy Restoration
cbec applied a full ‘process restoration’ strategy on a tributary of the River Dulnain, with the aim of reinstating dynamic geomorphic and ecological processes. We identified the dominant constraints to._.

Northern Liberty Island Fisheries Enhancement Project Assessment
cbec applied and refined a 2D hydrodynamic model using MIKE 21FM. The MIKE 21FM model developed by cbec encompasses a complex network of tidal channels (both natural and man-made) within._.

Grady Ranch EIS/EIR Review
Photos depict large-scale bank erosion and stream degradation Photos depict large-scale bank erosion and stream degradation cbec is providing peer review as part of a revision of an EIS/R associated._.

Feather River Levee Setback Project
Backwater on Feather River Feather River This project is a follow-on project to the recently constructed Bear River Levee Setback project although it is approximately three times the size of._.