At the end of August cbec were involved in a community consultation event in the town of Biggar in South Lanarkshire. The aim of the drop in event was to update the local community on design proposals for restoring two stretches of the Biggar Water and to hear their views and listen to any concerns about the proposed works. Overall it was a really positive event with the community generally very supportive of the designs that cbec have developed. cbec’s in house graphic designer provided a number of posters for the event which were really well received and helped communicate the objectives of the project as well as the proposed designs.

The Biggar Water Restoration Project is a partnership project between Tweed Forum, Destination Tweed and SEPA. The Project aims to reinstate a more natural river for two sections of the Biggar Water, both of which have been straightened and in places are disconnected from their floodplains. In the past embankment and hard bank protection has been installed and a number of bridges which constrain the natural course of the river. All of these features are currently impacting on the natural functioning of the river which is not only resulting in negative impacts on habitats and biodiversity but also influences issues such as the build up of sediment and regular flooding of the golf course. The restored channel will enhance the area for the local community to enjoy whilst also offering catchment wide ecological improvements by reconnecting new and existing habitats and revitalising the wildlife corridor along the river.  By restoring the Biggar Water the intention is that local habitats, biodiversity and public amenity in the area will be improved and valuable accessible greenspace created for the benefit of the local community and visitors to the town of Biggar.