Projects

 

our projects

Focus Areas Covered:
Technical Services Used:
River/Watershed:

The River Darent, Acacia Hall/ Central Park, Dartford

cbec was contracted by Dartford Borough Council and South East Rivers Trust to produce restoration designs for an extended section of the River Darent in Acacia Hall and Central Park,._.

Read more

The River Nairn at Aberarder

cbec was contracted by Aberarder Estate to develop detailed designs for the restoration of the upper River Nairn, having previously conducted geomorphic and ecological assessments of the site to determine._.

Read more

River Naver Catchment Restoration

cbec led a team to develop a prioritised catchment restoration plan on the River Naver, Sutherland. The primary objective of the project was, through reinstatement of natural geomorphic processes, to._.

Read more


Dowlais Culvert Assessment

cbec undertook work relating to the design of a culvert on the Nant Morlais stream in Dowlais, Merthyr Tydfil. An upgraded access track suitable for the transport of construction machinery._.

Read more

Wooler Bank Stabilisation

cbec was contracted by the Tweed Forum to design measures to stabilise a section of eroding bank on the Wooler Water, Northumberland. The Wooler Water is a highly dynamic gravel-bed._.

Read more

River Wandle Restoration

cbec was contracted by The Wandle Trust in south London to restore a 1.5 km of an urban chalkstream, involving the removal/ modification of three weir structures and associated channel._.

Read more


SEPA Pilot Catchment Project – Options Appraisal and Outline Design – River Nith (Castlemains, New Cumnock)

cbec have developed detailed restoration designs for a reach of the River Nith at Castlemains, New Cumnock. This reach was prioritised for restoration in the first phase of SEPA’s pilot._.

Read more

River Otter, Devon

cbec, in conjunction with APEM Ltd, conducted habitat modelling on three ~500m long sections on the River Otter, Devon to assess the impacts of changes to the flow regime. The._.

Read more

River Nar at Pentney

cbec, in conjunction with frog environmental, were contracted by the Norfolk Rivers Trust to design restoration measures for the tidally-influenced end of a chalk stream in north Norfolk. cbec undertook._.

Read more


Ellie Burn Wetland Enhancement

cbec was contracted to develop restoration measures for the wetland around Ellie Burn, Aberdeenshire, with the ultimate aim of assisting in the improvement of the current ‘moderate’ ecological status (as._.

Read more

Eddleston Water Restoration at Cringletie, Lake Wood and Shiphorns

cbec was contracted by Dundee University and the Tweed Forum to provide the joint benefits of improving the ecological status (through river restoration) and natural flood management (NFM) of the._.

Read more

East Tullos Burn Restoration

cbec was contracted by Aberdeen City Council to restore the East Tullos Burn in Torry from a hard‐engineered straightened channel into a more natural stream and associated functional floodplain. An._.

Read more


our projects

Focus Areas Covered
Technical Services Used
River/Watershed

[/wpv-filter-controls]

Coon Creek Watershed Assessment

Survey reach characterized by fluvial audit Specific Stream Power analysis from the geomorphic assessment cbec and H.T. Harvey and Associates (HTH) are performing a multi-disciplinary assessment of the Coon Creek._.

Read more

Prospect Island Tidal Restoration Project, Phase 1 Calibration and Validation

Tules surrounding a tidal channel in the Cache Slough Complex Snapshot of model mesh and bathymetry The Cache Slough Complex is located within the Legal Delta, California. cbec previously developed._.

Read more

Sacramento River East Levee Erosion Repair Design Assistance

Erosion Repair Site Survey in Sacramento River Erosion Repair Site Survey Transect The Sacramento Flood control Agency (SAFCA) is undertaking a project to repair nine erosion sites on the Sacramento._.

Read more


Donner Basin Watershed Assessment

Erosion Hazard Analysis Floodplain and channel restoration concept graphic for creek confluence cbec, joined by HTH and Susan Lindstrom (consulting archeologist), is conducting a watershed assessment of the Donner Basin,._.

Read more

Butano Creek Floodplain Reconnection and Restoration Design

Channel conditions in the project reach Simulated floodplain inundation for a 2-year event in the existing condition cbec is currently developing designs for a restoration project that will reconnect a._.

Read more

Lower American River – Temperature Refugia, Temperature Monitoring, and On-Call Support

Trimaran setup for temperature mapping Example of temperature mapping cbec has provided temperature and stage monitoring on the Lower American River (LAR) since 2008. In continued support of this effort,._.

Read more


Fremont Weir Alternative 5

10% Grading Plans 10% HEC-RAS Modeling As part of the DWR/USBR Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project EIS/EIR to identify and evaluate alternatives to address fish passage._.

Read more

American River Parkway Cordova Creek Naturalization

Mid-Construction Photo Showing Original Channelized Reach on Right cbec provided restoration/rehabilitation design services for Cordova Creek. Our approach to habitat restoration design and planning included three co-equal goals of the._.

Read more

our projects

Focus Areas Covered:
Technical Services Used:
River/Watershed:

Hallingdalselva Habitat Enhancement

In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway. The study reach is impacted._.

Read more