Projects

 

our projects

Focus Areas Covered:
Technical Services Used:
River/Watershed:

Allt Lorgy Restoration

cbec applied a full ‘process restoration’ strategy on a tributary of the River Dulnain, with the aim of reinstating dynamic geomorphic and ecological processes. We identified the dominant constraints to._.

Read more

our projects

Focus Areas Covered
Technical Services Used
River/Watershed

[/wpv-filter-controls]

Apalachicola River Restoration Feasibility Analysis

Swift Slough during low flow periods Apalachicola Floodplain Sloughs Swift Slough has been established as the primary habitat on the Apalachicola River System for several threatened and endangered (T&E) mussel._.

Read more

Lower American River – Sunrise Side Channel Design and Post-Project Performance Monitoring

Aerial image of the Sunrise Side Channel (on right) taken in 2009, after construction. Velocity measurements taken at 1500 cfs, to evaluate compliance with design criteria This project included modification._.

Read more

Yolo Ranch Tidal Wetland Restoration Project

Tidal Wetland Restoration Project Overview Network 2 and 3 Modeled Inundation cbec was contracted by SFCWA to develop the largest restoration project in the Lower Yolo Bypass in Yolo County,._.

Read more


Triangle Rock Weir Design

Upper Laguna Creek flowing through Triangle Rock Property Map of the Site and Proposed Alternatives cbec performed hydraulic analysis of Upper Laguna Creek to support the design of flood mitigation._.

Read more

Alder Creek Hydromodification Impacts Assessment

Project features Erosion Potential (EP) Compliance cbec, inc. was contracted by MacKay & Somps, at the suggestion of Sacramento County DWR, to assess hydromodification impacts of the planned Glenborough at._.

Read more

Northern Liberty Island Fisheries Enhancement Project Assessment

cbec applied and refined a 2D hydrodynamic model using MIKE 21FM. The MIKE 21FM model developed by cbec encompasses a complex network of tidal channels (both natural and man-made) within._.

Read more


Feather River Levee Setback Project

Backwater on Feather River Feather River This project is a follow-on project to the recently constructed Bear River Levee Setback project although it is approximately three times the size of._.

Read more

Santa Ynez River Two-Dimensional Flow Model

Santa Ynez River Simulated velocity for a flow of 6,150 cfs Water surface elevation for a flow of 1,300 cfs cbec was contracted by NMFS to construct a two-dimensional hydrodynamic._.

Read more

Lower Squaw Creek Restoration Project

A straightened and over-sized reach of the stream channel, with the ski resort in the background Examples of existing grade control and bank hardening currently in place This project intends._.

Read more


Yuba Goldfields Fluvial Geomorphic Assessment

Bank retreat between 1964 and 2009 cbec performed a geomorphic assessment of the lower Yuba River adjacent to the Yuba Goldfields. The focus of the effort was to assess the._.

Read more

Urrutia Pond and Bank Restoration Project

Draft conceptual plan for Urrutia Draft conceptual cross section cbec is part of a team preparing the SMARA reclamation and restoration plan for the Urrutia Pond and associated river bank._.

Read more

Lower Putah Creek Restoration Project

The Lower Putah Creek Restoration Project would create a new Lower Putah Creek channel through the Yolo Bypass Wildlife Area (YBWA). This channel would connect to and enhance the existing._.

Read more


our projects

Focus Areas Covered:
Technical Services Used:
River/Watershed:

Hallingdalselva Habitat Enhancement

In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway. The study reach is impacted._.

Read more