In 2024, CBEC was contracted by Lockett Agri-Environmental Ltd to develop a detailed restoration design for a reach of the River Peffery, near Fodderty

Funded by NatureScot’s Nature Restoration Fund, this project was informed by a previous catchment-scale scoping study delivered by CBEC in 2023, which highlighted the site as appropriate for river restoration and identified high-level measures that would best achieve the following objectives:

  • reinstate floodplain connectivity and enhance wetland habitats;
  • restore river form and processes that reflect a sinuous, pool-riffle channel; corresponding to the reference river conditions at the site; and
  • deliver a design that does not increase flood risk to downstream receptors and decreases flood risk where possible.

The restoration design delivers a river and floodplain environment that better reflects more natural, low-impact conditions. To achieve this, the design maximises opportunities to enhance diversity and connectivity across the channel and floodplain, specifically by increasing channel sinuosity and depositional features, and by instating several ‘online’ floodplain features including wet woodland, wetlands, and backwater features.

Following the development of detailed designs, the securing of necessary permissions/approvals, construction undertaken by CR Contracting North Ltd, commenced in May 2025, with CBEC staking out the design and providing construction supervision. Look out for future updates from the site on our social media pages!