CBEC was engaged by Groundwork North East & Cumbria (GNEC) to assess the feasibility of enhancing estuarine habitat at three separate sites within the Wear Estuary between the A19  and Northern Spire Bridge.

Each site varied greatly in its morphology, demanding the development of a series of different restoration approaches. The largest of the three sites, Barons Quay, features a large area of well-developed salt marsh, punctuated by small drainage creeks. The front edge of this salt marsh was observed to be actively eroding, which has the potential to lead to losses of salt marsh over time. A solution involving the implementation of polder fencing was assessed and determined to be feasible due to the lack of constraints on site, and favourable width of mudflat in front of the saltmarshes’ leading edge. Design drawings of the proposed restoration were created, outlining the row of polder fencing complete with fish gates, which will increase sediment accretion rates, accelerating the colonisation of saltmarsh upon the mudflats. Large wood was also incorporated into the design, being placed behind the polder fencing, to further increase roughness within the floodplain, increasing rates of sediment drop out and accretion.

The site furthest upstream (South Hylton) was considerably more constrained, with large brick retaining walls making up the bank profile. As a result of this, a solution using polder fencing was not feasible, as the retaining wall location restricts the installation of polder fencing at the correct elevation to facilitate the colonisation of saltmarsh vegetation. Therefore, a vertical greening solution was developed, with the installation of wooden timber structures proposed to create space for the deposition of sediment and subsequent colonisation by saltmarsh plants.

Artistic visualisations of each restoration option were developed in order to provide a visual representation of what each option would look like post-construction. The visualisations for Barons Quay were featured on the BBC website. GNEC is seeking permissions for the construction of the Barons Quay restoration, and this is expected to begin in 2025.

West Thurrock Saltmarsh Restoration

CBEC was engaged by the Port of London Authority (PLA) to develop design drawings for saltmarsh restoration on the Thames Estuary at West Thurrock Lagoon and Marshes SSSI. Based on the conditions observed at the site, it was determined that a polder fencing approach was the best option. The polder fencing was designed to sit between the Mean High Water Neap (MHWN) and Mean Lower Water Neap (MLWP) to maximise the quantities of sediment that will be trapped behind the polder fencing, raising the mudflat levels to an elevation that can be colonised by saltmarsh plants. The project was constructed in 2021 by Salix River and Wetland, and also included plug planting of saltmarsh vegetation in order to kickstart the colonisation process.