CBEC were commissioned by Affinity Water Services Ltd to undertake the Phase III restoration design of the River Beane at Woodhall Estate, Hertfordshire.
The Phase III project builds on the previous two projects, aiming to mitigate the effects of historical dredging and straightened that have resulted in a loss of connection to the floodplain and chalk stream characteristics.
The design was developed to reconnect the Beane with the floodplain and create a more natural sinuous channel more in keeping with chalk stream conditions (i.e., multi-thread, connected with water meadows, high groundwater level. The design also considered improving habitat for the water vole, otter, kingfisher, and fish species. The redesigned channel increased the river length of this reach of the River Beane from 600 m to 1000 m and included the creation of 3280 m2 of new wetland habitat. A flood bund was added to contain small flood events within the floodplain, resulting in complete inundation of the floodplain during smaller storm events.
Key challenges addressed through the design process included protecting a 90-year-old water system main running through the site and under the new channel, managing impacts on protected species present, including water voles, and maintaining flows into the Stapleford Marsh Ditch. The project was constructed from late summer 2024 through to early 2025, with CBEC acting as the Principal Designer and supervising the construction phase.