CBEC was asked to design a sustainable bank protection solution that was resilient to the highly dynamic nature of the Wooler Water in order to protect nearby buried pipes.

Design development was informed by a detailed Fluvial Audit and iterative Morphodynamic modelling, taking a process-based approach that worked with natural river processes to achieve a sustainable design. The final design protects the bank toe with tree trunks with their root plates attached and rock roll pyramids. The upper bank was reprofiled to a more stable gradient, and the newly formed bank surface is protected with a willow mattress formed by a lattice of willow brush attached to the bank, incorporating topsoil and seeded with a native riverbank seed mix.

The roughness and resilience of the willow mattress provided immediate protection to the bank over the autumn and winter months, and now the spring has initiated the next phase, where the willow and seeded vegetation grow and colonise the bank. This self-sustaining living structure utilises natural processes where the roots act to bind the riverbank substrate, increasing resilience, and the surface vegetation increases roughness, which dissipates erosive forces in high flows.